Skip to content
Drone Data

Virtual tours

360 virtual tours in Romania, ground and aerial

We capture properties, hotels and venues as interactive 360° tours, with drone panoramas of the surroundings on request. You receive a branded tour that opens in any browser, 5–7 working days after capture.

  • No app needed, on phone or desktop
  • Embeddable on your website; Google Street View on request
  • Hotspots included; drone panoramas and floor plans on request
  • 8 public tours online
  • Delivery in 5–7 working days
  • Ground and drone panoramas
  • Written quote within 24 h on working days

A property visitors can walk through before they call

A 360° virtual tour is a set of linked panoramic images that a visitor moves through in the browser, room by room and from the air. Real-estate agencies, developers, hotels, guesthouses and event venues receive a branded tour hosted on our viewer, ready to embed on any website 5–7 working days after capture.

Each scene is a full spherical panorama. Hotspots inside the scenes add text, photos and links or lead to the next room, and a floor plan shows visitors where they stand. Aerial scenes, shot from the drone, show the plot, the access roads and what surrounds the property.

Tours are hosted on virtual.dronedata.io, carry your logo and colours and open without an app. We can also publish the scenes to Google Street View for your business profile, so the tour is visible in Google Maps and Search.

Capture takes about half a day for a villa and one day for a resort. Built-in analytics show how often the tour is opened.

Where virtual tours are used

  • Real-estate agencies and developers

    Listings and new developments that buyers can tour remotely before booking a viewing.

  • Hotels and guesthouses

    Rooms, reception, restaurant and grounds shown as they are, before the booking.

  • Event venues

    Halls and gardens that couples and event planners can walk through from home.

  • Resorts and ski areas

    Slopes, lifts and facilities linked into one tour, with aerial scenes for scale.

  • Construction sites

    Progress tours for investors and site managers, captured stage by stage.

  • Offices, retail and museums

    Spaces that people can visit online, from a showroom to an exhibition.

A tour answers questions before the first visit

  • Better-prepared visitors

    Buyers and guests see the layout and finishes first, so the viewings you book are with people already interested.

  • Works on any device

    The tour opens in any browser on phone, tablet or desktop, with nothing to install.

  • Your brand in the viewer

    Logo, colours and contact details stay visible for the whole visit.

  • Found on Google

    Street View publishing puts the tour on your Google business profile.

  • The view from above

    Drone panoramas show the plot, access, view and surroundings that ground photos miss.

  • One link, many channels

    Embed it on your website, add it to listings, send it on WhatsApp or use it in ads.

From first call to a published tour

Five steps and one site visit. Most of the work happens after we leave the property.

  1. Evaluation

    You send the address, the size and the number of rooms or areas. A written quote follows within 24 h on working days.

  2. Scheduling

    We agree a date with good light and a property that is clean and ready to show.

  3. Capture on site

    About half a day for a villa and one day for a resort, with the drone panoramas in the same visit.

  4. Production

    We stitch and retouch the scenes, then add hotspots, the floor plan and your branding.

  5. Delivery

    You receive the link and the embed code 5–7 working days after capture. Street View publishing follows if ordered.

What the offer includes

Every quote lists the scenes, the aerial panoramas and the extras one by one, so you can compare offers line by line.

  • Ground 360° scenes

    Full spherical panoramas of each room or area, stitched and retouched.

  • Aerial 360° panoramas

    Drone panoramas of the property and its surroundings, linked into the tour, on request.

  • Interactive hotspots

    Navigation points, text, photos and links placed inside the scenes.

  • Floor plan

    A plan of the property with the visitor position marked, on request.

  • Branding and hosting

    The tour hosted on virtual.dronedata.io with your logo and colours, plus an embed code.

  • Google Street View publishing

    The scenes published to your Google business profile, on request.

  • Analytics

    View counts for the tour, so you see how often it is opened.

Tour specifications

Tour specifications
Viewervirtual.dronedata.ioNo app needed
DevicesPhone, tablet and desktop browsers
ScenesGround and aerial 360° panoramas
ExtrasHotspots, floor plan, branding, analytics
PublishingWebsite embed; Google Street View on request
CaptureHalf a day for a villa, one day for a resort
Delivery5–7 working days after capture

Capture and delivery times are typical. The written quote states the exact delivery date for your property.

What visitors do inside a tour

  • Move room to room

    Click the next doorway or pick a room from the floor plan.

  • Look in every direction

    Drag, or turn the phone, to see walls, ceilings and the view from each window.

  • Read details on the spot

    Hotspots show text, photos or links next to the feature they describe.

  • Rise above the property

    Switch to an aerial scene to see the plot, the access and the neighbourhood.

Tours online now

Eight public tours, from a resort and a ski area to a construction site. Each one opens in a new tab.

Resort

Resort(opens in a new tab)
Public tours online
8
Delivery after capture, working days
5–7 days
Capture for a villa
½ day
Written quote, working days
24 h

Questions about virtual tours

What does a virtual tour include?

Ground 360° scenes of every room or area, hotspots for navigation and information, hosting on our viewer with your branding and an embed code. Aerial panoramas, a floor plan and Google Street View publishing are added on request, and each one is listed separately in the written quote.

How long does it take to make a virtual tour?

You receive the finished tour 5–7 working days after capture. Capture takes about half a day for a villa and one day for a resort, on a date we agree around good light. Production covers stitching, retouching, hotspots, the floor plan and branding, and the written quote states the delivery date before we start.

Can I put the tour on my website and on Google?

Yes, both. You receive an embed code that works on any website, and the same link can go into listings, emails and messages. On request, we publish the scenes to Google Street View for your business profile, so the tour appears in Google Maps and Search.

What affects the price of a virtual tour?

The size of the property and the number of scenes, plus any aerial scenes, a floor plan and the hosting period. A 70 m² apartment needs far fewer scenes than a resort. Send the address, the area and the number of rooms, and you receive a written quote within 24 h on working days.

What do you need from me on the day of a tour shoot?

Access for the agreed time, about half a day for a villa, with rooms cleaned, lights on and personal items put away. A 360° camera sees the whole room at once, so anything left out appears in the tour. For aerial scenes, we also need access to the garden or plot.

Do the tours include drone images?

Yes, when the location benefits from them. Aerial 360° panoramas show the plot, the view, the access and the surroundings, and link into the tour like any other scene. Our pilots hold EASA A1/A3 and A2 certificates, and we check the airspace for every address before the shoot.

How is a virtual tour different from regular listing photos?

A 360° tour shows the whole space and how the rooms connect, and visitors decide where to look and how long to stay in each room. Use it alongside listing photos; we also shoot aerial photos for listings when the property benefits from them.

Do you shoot virtual tours outside Bucharest?

Yes, anywhere in Romania, from apartments and villas to resorts and ski areas. We work from our base in the Bucharest and Ilfov area, with mobilization in 24–72 h, and travel distance is part of the written quote. Capture takes about half a day for a villa and one day for a resort.

Get a quote for your virtual tour

Send the address, the area and the number of rooms. The written quote lists every scene and extra, with the delivery date.

  • Reply within 24 h on working days
  • Written quote, no obligation
  • Your data stays confidential

We work across Romania, with mobilization in 24–72 h.

  • Reply within 24 h on working days
  • Written quote, no obligation
  • Your data stays confidential

Projects with this service

    • Hospitality and real estate
    • 360° virtual tours

    360° virtual tours portfolio

    360° virtual tours for a resort, an event venue, a hotel, a ski resort, villas, a residential building and a construction site, with 8 tours online.

    Public tours
    8
    Property types
    Resort, venue, hotel, ski resort, villas, residential building, construction site
    Capture
    Ground and aerial panoramas
CallWhatsAppQuote