Skip to content
Drone Data

Projects

Drone inspection projects in Romania

Solar parks, a rooftop PV system, aerial films and 360° tours, described with the specs we flew and without client names. Every mission below was flown in Romania.

    • Solar energy
    • Solar farm inspection

    60 MWp solar park thermal survey, Alba County

    Thermal and RGB acquisition to the specification of an analytics platform on a solar park of about 60 MWp and 70 ha in Alba County, 2026.

    Installed capacity
    ~60 MWp
    Site area
    ~70 ha
    Thermal GSD
    6 cm
    • Solar energy
    • Solar farm inspection

    About 56 MW PV park data acquisition, Satu Mare

    Thermal and RGB data acquisition for an international pilot network on a solar park of about 56 MW in Satu Mare County, 2026.

    Installed capacity
    ~56 MW
    Data format
    RGB/IR folder pairs
    Delivery
    Through the network's uploader
    • Solar energy
    • Solar farm inspection

    9.5 MW solar park thermal acquisition, Prahova

    Data acquisition for the thermal inspection of a 9.5 MW solar park in Prahova County, flown in about 2 h 15 min on site in 2026.

    Installed capacity
    9.5 MW
    Time on site
    2 h 15 min
    Drone
    DJI Mavic 3T
    • Commercial rooftop PV
    • Solar farm inspection

    Rooftop PV inspection, Iași shopping centre

    Full thermal inspection of the rooftop PV system of a shopping centre in Iași, 2026, carried out as a subcontractor to an O&M contractor.

    Asset
    Rooftop PV, shopping centre
    Role
    Subcontractor to an O&M contractor
    Scope
    Acquisition, analysis, classification
    • Solar energy
    • Aerial photo and video

    Aerial video of 20+ solar parks

    More than 20 solar parks across Romania filmed and photographed from the air for marketing and investor reports, 2023 to 2026.

    Parks filmed
    20+
    Period
    2023–2026
    Use
    Marketing and investor reports
    • Hospitality and real estate
    • 360° virtual tours

    360° virtual tours portfolio

    360° virtual tours for a resort, an event venue, a hotel, a ski resort, villas, a residential building and a construction site, with 8 tours online.

    Public tours
    8
    Property types
    Resort, venue, hotel, ski resort, villas, residential building, construction site
    Capture
    Ground and aerial panoramas

Plan a mission like these

Send the site, the size and the specification you work to. You receive a written quote with the flight window and the delivery date.

  • Reply within 24 h on working days
  • Written quote, no obligation
  • Your data stays confidential

We work across Romania, with mobilization in 24–72 h.

  • Reply within 24 h on working days
  • Written quote, no obligation
  • Your data stays confidential
CallWhatsAppQuote