Skip to content
Drone Data

Data acquisition partner

Your drone data acquisition partner in Romania

We fly PV sites to your platform spec. Complete, EXIF-intact RGB/IR datasets reach your folder structure or uploader within 24–48 h of the flight. We mobilize anywhere in Romania in 24–72 h and report every deviation from the spec in writing.

PV capacity flown in 2026
400+ MW
PV sites delivered to platform specs
20+
From flight to upload
24–48 h
Mobilization anywhere in Romania
24–72 h

Solar inspection drone pilots for platforms and O&M

We are the local thermal drone pilot team for companies that own the analysis or the asset. You keep the spec and the client relationship; we fly the sites.

  • PV analytics platforms

    You own the spec and the analysis pipeline. We supply Romanian flights built to pass your ingest checks, with no travel costs from abroad.

  • Pilot networks

    You dispatch the missions. We take the Romanian sites, fly them to the network brief and upload RGB/IR folder pairs through your uploader.

  • O&M contractors

    You maintain the plant. We fly the inspection, run the Scopito analysis and hand over a report your field team can act on. We did this as a subcontractor on a shopping-centre rooftop in Iași.

  • EPCs and asset owners

    You need data at handover, before a warranty expires or for a yearly campaign. We schedule it and deliver to the platform you use.

Acquisition specification

Default values, taken from the platform missions we flew in 2026. Before the first flight we set every parameter to your brief and confirm it in writing.

Acquisition specification
Drone and sensorDJI Mavic 3T: radiometric 640×512 thermal, 48 MP wide RGB, 56× hybrid zoomDJI Matrice 350 RTK and Mavic 3 Enterprise available for larger missions
Thermal GSD3–6 cm3 cm detailed, 6 cm overview
Overlap85% front, 65% side
Irradiance≥ 600 W/m²Measured on site, logged per flight
Sky, wind, timeClear sky, wind within limits, around solar noon
Image pairsOne RGB frame for every thermal frame
MetadataEXIF, GPS and radiometric payload intactByte-identical files, no re-encoding
Folder structurePer platform, for example RGB/IR folder pairs
UploadWithin 24–48 h of the flightThrough your uploader or into your folder structure
Mobilization24–72 h anywhere in Romania
Daily capacityUp to about 50 MW per flight day in good irradiance
CoverageAll Romanian countiesNeighbouring countries on request

Acquisition conditions follow the recommendations of IEC TS 62446-3. Altitude and flight direction relative to the rows are set per platform spec.

How a partner mission runs

  1. Brief

    You send the site list, capacities, spec sheet and deadlines. We confirm feasibility and price per site within 24 h on working days.

  2. Flight plan per spec

    We set GSD, overlap, altitude, flight direction relative to the rows and the time window, then check the airspace.

  3. Weather and irradiance window

    We track the forecast and fly on the first day that meets your irradiance and sky requirements.

  4. Acquisition and coverage check

    We fly, log irradiance on site and check coverage block by block before the team leaves.

  5. QC and upload

    We run the blur, coverage and file-count checks, then upload within 24–48 h of the flight.

  6. Mission log

    You receive flight times, irradiance readings, weather, file counts and any deviation from the spec, in one log per site.

Quality control before every upload

  • Coverage check

    On site, we verify that every block was captured at the required overlap. Gaps are reflown while the irradiance window is still open.

  • Blur check

    We review the frames for motion blur and focus errors and refly the affected lines instead of sending weak frames.

  • Irradiance log

    Irradiance is measured on site and logged for every flight, so each dataset carries a record of its acquisition conditions.

  • File-count reconciliation

    Thermal and RGB counts are reconciled per folder before upload. We find a missing pair before your ingest does.

  • Data integrity

    Files are copied byte-identical, with no re-encoding. EXIF, GPS and the radiometric payload stay exactly as the drone wrote them.

  • Accepted at first submission so far

    Every dataset delivered to a platform or pilot network so far was accepted at first submission, with no reflight requested.

Every Romanian county, from one local team

We fly in all Romanian counties from our base in the Bucharest and Ilfov area, with mobilization in 24–72 h. In 2026 we flew missions in Alba, Satu Mare, Prahova and Iași counties. For partner missions we also fly in neighbouring countries on request. A local team means no travel costs from abroad, a fast reaction to weather windows and a Romanian-speaking contact for site operators and security staff.

  • All 41 counties and Bucharest
  • Republic of Moldova
  • Bulgaria
  • Hungary
  • Serbia

Compliance and airspace

  • EASA-certified pilots

    Our pilots hold EASA open category A1/A3 and A2 certificates. Copies are sent on request before the first mission.

  • Romanian AACR rules

    Every flight follows the rules of AACR, the Romanian Civil Aeronautical Authority.

  • Airspace checks and authorizations

    We check the airspace for every site and request any authorization a controlled or restricted zone needs before the flight date is confirmed.

  • Site rules and confidentiality

    We follow the access and safety rules of each plant. Partner datasets go only to you and the platform you name.

  • Romanian on site, English in reporting

    We coordinate access and timing with plant staff in Romanian and report to your team in English, through one contact from brief to mission log.

  • EUR invoicing

    WEALTH FLUX SRL, the Romanian company that operates Drone Data, invoices per MW or per flight day, with volume pricing for recurring campaigns.

Specs we fly to

Each platform defines its own GSD, overlap, flight direction, file naming and upload route. We keep a checklist per spec and set the mission to it before the first flight.

  • Zeitview
  • Sitemark
  • Raptor Maps
  • Volateq
  • Scopito
  • Above
  • Aerial Insights

Platform names are used to describe acquisition specifications we are familiar with; they are not endorsements.

Partner questions

Which specs can you fly to?

Any written acquisition spec with a thermal GSD of 3–6 cm. We set the overlap, altitude, flight direction relative to the rows and the time window you require, and fly at irradiance of at least 600 W/m². In 2026 we flew a park of about 60 MWp in Alba County to 6 cm GSD and 85/65 overlap for a PV analytics platform. Send your spec sheet and we confirm each parameter in writing.

What is your coverage and mobilization time?

All Romanian counties, with mobilization in 24–72 h. For partner missions we also fly in the Republic of Moldova, Bulgaria, Hungary and Serbia on request. Because we are based in Romania, a flight can move to the next day with good irradiance without new travel costs.

How do you make sure the dataset is complete?

With four checks before upload: coverage on site, blur review, the irradiance log and file-count reconciliation per folder. Files stay byte-identical, with EXIF, GPS and the radiometric payload intact. Gaps found on site are reflown before we leave. Every dataset we have delivered so far was accepted by the receiving platform at first submission.

Which drones do you use?

The DJI Mavic 3T for PV thermography: a radiometric 640×512 thermal sensor, a 48 MP wide RGB camera and 56× hybrid zoom. For larger missions a DJI Matrice 350 RTK and a Mavic 3 Enterprise are available, with LiDAR on request.

Can you upload directly to our platform?

Yes, through your uploader or into your folder structure, within 24–48 h of the flight. For an international pilot network we delivered a park of about 56 MW in Satu Mare County and a 9.5 MW park in Prahova County as RGB/IR folder pairs through the network's uploader.

How do you price partner work?

Per MW or per flight day, with volume pricing for recurring campaigns, invoiced in EUR. Send the site list and the spec, and you receive a written price per site within 24 h on working days. Multi-site campaigns are quoted as one package, so the rate reflects the total volume.

Can you handle multi-site campaigns?

Yes. We have captured about 10 PV sites for one pilot network and fly up to about 50 MW per flight day in good irradiance. For a campaign we group sites by region and weather window and report progress per site in the mission log. For yearly campaigns we fly each site to the same written spec, so the datasets compare year on year.

Are your pilots certified?

Yes, our pilots hold EASA open category A1/A3 and A2 certificates, and every flight follows the rules of AACR, the Romanian Civil Aeronautical Authority. We run an airspace check for every site and request any authorization the zone requires before the flight date is confirmed.

Put a Romanian acquisition team on your roster

Send your spec sheet and a site list. We reply within 24 h on working days with feasibility, a date window and a price per site.

  • Reply within 24 h on working days
  • Written quote, no obligation
  • Your data stays confidential

We work across Romania, with mobilization in 24–72 h.

Partner request

Tell us the platform, the spec and the sites. The lead pilot reads every request and replies within 24 h on working days.

  • Reply within 24 h on working days
  • Written quote, no obligation
  • Your data stays confidential
CallWhatsAppQuote