Aerial photography in Romania for property, energy and construction
We shoot aerial photos and video of properties, hotels, solar parks and building sites, then edit and grade the footage. You receive a 4K master, 16:9 and 9:16 edits and a photo set, with usage rights included.
Aerial photo and video is drone footage shot and edited for marketing, sales and reporting. Real-estate agencies, developers, hotels and solar marketing teams receive an edited video, a 4K master and a photo set by the date in the written quote.
We plan each shoot around the final format. A listing video needs a 16:9 cut for the website and a 9:16 cut for social feeds. An investor update needs steady, repeatable angles of the same site on every visit. A hotel needs the building in its setting, at the hour when the light suits the facade.
Energy sites are familiar ground. We have filmed more than 20 solar parks for marketing and investor reports, so we know how to show scale, row geometry and substations while keeping to the safety rules of each site.
Editing and colour grading are included, licensed music is available on request, and the delivered files come with usage rights. For real-estate agencies we offer a defined package of photos and video per listing, so every property in your portfolio is presented the same way.
Who orders aerial photo and video
Real-estate agencies
Listing photos and short videos that show the property, the plot and the neighbourhood.
Developers
Launch material for new projects and progress footage for buyers and banks.
Hotels and venues
The location, the grounds and the surroundings, for the website and booking platforms.
Solar and EPC marketing teams
Completed parks filmed for presentations, investor updates and tenders.
Construction companies
Progress films from the same points on every visit, for the client and the site file.
Creative agencies
Aerial shots for a campaign, delivered edited or as raw footage for your editor.
Footage cut for website, social and presentations
Every format from one shoot
16:9 for the website and presentations, 9:16 for social feeds, cut from the same flights.
Scale and context
The view from above shows the plot, the access and the surroundings in a single frame.
Ready to publish
Cutting and colour grading are included, so the files go straight to your channels.
Repeatable angles
For construction and investor updates we fly the same points on every visit, so progress reads clearly.
Rights included
Usage rights for the delivered files are part of the price, with no separate licence per channel.
Legal flights
EASA-certified pilots, Romanian AACR rules and an airspace check for every address, including urban sites where the rules allow a flight.
From brief to finished files
Five steps, with the delivery date fixed in the quote before we fly.
01
Brief
You tell us the location, the purpose and the channels. A written quote follows within 24 h on working days.
02
Shot plan
We plan angles, flight paths and the time of day for the light, and check airspace and permissions.
03
Shoot
We fly the planned shots in the best light of the day and capture extra angles that give the edit room to work.
04
Edit
We cut the 16:9 and 9:16 versions, grade the colour and add licensed music if you ordered it.
05
Delivery
You receive the edits, the 4K master and the photo set by download link, with raw footage on request.
What you receive
Every delivery includes usage rights for the files listed below, sent by download link.
Edited video
16:9 and 9:16 versions, colour-graded, ready for web and social.
4K master
The full-resolution master of the edit, for broadcast, screens and archives.
Photo set
Selected aerial photos in web and print resolution.
Raw footage
Unedited clips for your own editor, on request.
Licensed music
A licensed track for the edit, on request.
Real-estate package
A defined set of aerial photos and video for property listings. We send the package sheet with the quote.
Production specifications
Production specifications
Video master
4K
Aspect ratios
16:9 and 9:16
Photos
Web and print resolution
Post-production
Editing and colour grading included
Music
Licensed, on request
Raw files
On request
Rights
Usage rights included
Pilots certified EASA A1/A3 and A2. Every address gets an airspace check before the shoot date is confirmed.
Typical productions
Property listings
A photo set and a short video of the house, the plot and the area.
Hotel and venue films
The building, the grounds and the setting, edited for the website.
Solar park showcases
Scale, layout and substation of a completed park, for marketing and investors.
Construction progress
Monthly or milestone flights from fixed points, edited into one timeline.
Investor updates
Periodic footage of a park or a project for shareholders and lenders.
Events
Aerial footage of the venue and its setting, flown clear of the crowd as the rules require.
Solar parks filmed for marketing
20+
Video master
4K
Formats in every edit
16:9 + 9:16
Written quote, working days
24 h
Questions about aerial photo and video
Which formats do you deliver for aerial photo and video?
An edited video in 16:9 and 9:16, a 4K master and a photo set in web and print resolution. Raw footage and licensed music are available on request. Files arrive by download link, named and sorted so you can publish them directly.
Can you fly in cities?
Yes, where the airspace and the rules allow it. We check the AACR rules and the airspace for every address before the quote. In controlled zones, for example near airports, we request authorization first, and a few locations cannot be flown at all. You know which case applies before you order.
How long does delivery of aerial footage take?
The written quote fixes the delivery date, and you receive the quote within 24 h on working days. The date depends on the film length, the number of versions and the music: a short listing clip is edited faster than a solar park presentation film. If the weather moves the shoot day, the delivery date moves with it.
Do I own the usage rights to the photos and videos?
Yes. Usage rights for the delivered photos and videos are included, and they transfer to you upon full payment, within the limits set in the contract, as our terms state. You can use the files on your website, in listings, on social media and in print without a separate licence per channel.
What does an aerial shoot cost?
The price depends on the number of locations, the time on site, the complexity of the edit and the number of formats delivered. A photo session for a listing costs less than a presentation film with licensed music. Send the location and the purpose of the footage, and you receive a written quote within 24 h on working days.
How is aerial footage different from ground photography?
The view from above shows the plot, the access and the surroundings in a single frame, which ground photos miss. For a solar park it shows scale, row geometry and substations; we have filmed more than 20 for marketing and investor reports. We fly the same points on every visit, so construction progress compares directly.
Do you travel for shoots outside Bucharest?
Yes, anywhere in Romania, with mobilization in 24–72 h from our base in the Bucharest and Ilfov area. Travel distance is part of the written quote. Shoots that depend on the weather can move to a weekend when the forecast requires it, so the light and the date both work.
What do you need from us before an aerial shoot?
The location, the purpose of the footage and the channels where it will run, so we can plan the 16:9 and 9:16 cuts. For solar parks and industrial sites we also need the operator's access and safety rules. On the shoot day, we need access to the site at the agreed time.
Get a quote for your aerial shoot
Send the location, the purpose and where the footage will be used. The written quote states the price and the delivery date.
Reply within 24 h on working days
Written quote, no obligation
Your data stays confidential
We work across Romania, with mobilization in 24–72 h.
Radiometric thermal and RGB survey of PV plants, with every anomaly classified and located by string and module. Report in 5 working days for plants up to 20 MW.