
10 min read
What irradiance is required for a thermal inspection of PV modules? A complete guide
The irradiance required for a thermal inspection of PV modules is at least 600 W/m², the minimum value recommended by IEC TS 62446-3. Below that threshold, the temperature difference between a healthy cell and a faulty one becomes too small to read reliably in a radiometric thermal image. Most inspections in Romania are flown between…
Read the article




