We fly ground-mounted and rooftop PV plants with a radiometric thermal drone, classify every anomaly and locate it by string and module. For plants up to 20 MW, you receive the report within 5 working days of the flight.
Irradiance of at least 600 W/m², measured on site
Thermal GSD of 3–6 cm, with an RGB pair for every frame
A solar farm thermal inspection is a drone survey of every module in a PV plant with a radiometric thermal camera and an RGB camera. Asset owners, O&M contractors, EPCs and investors receive a PDF report, an anomaly list located by string and module, and a thermal orthomosaic within 5 working days for plants up to 20 MW.
Radiometric means every pixel stores a measured temperature. A hotspot (one or more overheating cells), a bypassed diode or a disconnected string shows up as a module warmer than its neighbours.
We follow the acquisition conditions recommended in IEC TS 62446-3: irradiance of at least 600 W/m² measured on site, clear sky and wind within the drone's limits. We fly around solar noon and, in good irradiance, cover up to about 50 MW per flight day.
Analysis runs in Scopito, a platform for anomaly classification and reporting, so every finding links to its thermal and RGB image pair.
For the people who run and finance PV assets
Asset owners
A yearly baseline of module health and dated evidence for warranty claims.
O&M contractors
A ranked fault list your operation and maintenance (O&M) team works through string by string.
EPCs at handover
An independent thermal record of the plant at commissioning, before the EPC (engineering, procurement and construction) performance period starts.
Investors and due diligence
Measured module condition for a transaction, in place of an assumption in the data room.
Insurers and loss adjusters
Documented damage after hail or a storm, with a GPS position for every affected module.
Rooftop PV owners
Systems on shopping centres, logistics halls and factories, inspected with nobody on the roof.
What an aerial PV inspection gives your team
Every module, one visit
The drone records every module, so no finding depends on where a technician happened to walk.
Faults ranked by severity
Each anomaly gets a class and a severity score, so the field team starts with the faults that cost the most yield.
Located to the module
Findings carry the string and module index plus GPS coordinates, so a technician walks straight to the right module.
No production stop
Thermography needs the plant running under load, so production continues while we fly.
Platform-ready data
If your analysis runs on a platform, we fly to its spec and deliver complete RGB/IR pairs with EXIF intact.
From brief to report in six steps
01
Brief and quote
You send the location, the installed capacity and the mounting type. A written quote follows within 24 h on working days.
02
Flight plan
We set GSD, altitude, overlap and flight direction relative to the rows, and check the airspace over the site.
03
Weather window
We book a clear day with irradiance of at least 600 W/m² and fly the window around solar noon.
04
Acquisition on site
We fly thermal and RGB together, log irradiance and check coverage before leaving.
05
Analysis and report
We classify anomalies in Scopito and check each one against its RGB pair. For plants up to 20 MW, the report reaches you within 5 working days.
06
Handover meeting
We walk your team through the findings and the priority list.
What you receive after the inspection
The report, anomaly list and maps come with every inspection. Exports and raw data are optional.
PDF inspection report
Location, inspection date, installed capacity, irradiance during the flight, drone model, methodology, anomaly summary by class and severity, conclusions and a recommended date for the next inspection.
Anomaly list
Every finding with its class, severity, string and module index and GPS coordinates.
Thermal and RGB image pairs
One radiometric and one visual image for every anomaly.
Overview map and thermal orthomosaic
A plant map with anomaly markers, and an orthomosaic: a single georeferenced thermal image of the whole site.
CSV or Excel export
The anomaly table in a format your maintenance system can import, on request.
Raw dataset
Original R-JPEG (radiometric JPEG) thermal frames and RGB frames, with EXIF metadata (camera, time and GPS position) intact, on request.
Acquisition parameters
Acquisition parameters
Drone
DJI Mavic 3T
Thermal sensor
Radiometric, 640×512
RGB sensor
48 MP wide, 56× hybrid zoom
Thermal GSD
3 cm detailed, 6 cm overview
GSD is the ground size of one pixel
Overlap
85% front, 65% side
When the data goes to an analytics platform
Irradiance
≥ 600 W/m²
Measured on site and logged with the flight
Sky and wind
Clear sky, wind within drone limits
Time window
Around solar noon
Capacity
Up to about 50 MW per flight day
Report
5 working days
For plants up to 20 MW
Acquisition conditions follow the recommendations of IEC TS 62446-3.
Anomaly classes in our reports
Hotspots
Single-cell and multi-cell, scored by temperature difference.
Bypass diodes
One third of a module running hot.
Modules and strings offline
Open-circuit modules and strings (series-wired chains of modules) that are not producing.
PID-like patterns
Signs of potential-induced degradation (PID) spreading along a string.
Soiling, shading and vegetation
Dirt, shadows and plants that cut output.
Physical damage
Cracked glass, missing modules, hot junction boxes and connectors.
PV capacity flown in 2026
400+ MW
On site for a 9.5 MW park
2 h 15 min
Thermal ground sampling distance
3–6 cm
Report turnaround, working days
5 daysPlants up to 20 MW
Questions about PV thermal inspection
How long does it take to inspect a 10 MW solar park?
Plan for a few hours on site, within one flight day: a 9.5 MW park in Prahova County took about 2 h 15 min in 2026, setup and coverage check included. The report follows within 5 working days of the flight for plants up to 20 MW.
What weather do you need for a thermal inspection?
Irradiance of at least 600 W/m², a clear sky and wind within the drone limits, as recommended in IEC TS 62446-3. Under these conditions faulty cells run clearly hotter than healthy ones. We measure irradiance on site, log it with the flight and move the date if the forecast misses the threshold.
What do you need from us before a PV thermal inspection?
The plant location, the installed capacity, the mounting type (ground-mounted or rooftop) and access on the agreed date. With these we set GSD, altitude, overlap and flight direction relative to the rows, and check the airspace. We fly anywhere in Romania, with mobilization in 24–72 h.
What does a PV thermal inspection cost?
The price depends mainly on installed capacity, the mounting type (ground-mounted or rooftop) and the travel distance to the plant. Detail level also counts: 3 cm or 6 cm thermal GSD, a platform export, CSV files or the raw dataset. Send the plant details and you receive a written quote within 24 h on working days. Recurring yearly inspections are quoted as a campaign.
What do I receive after a PV thermal inspection?
You receive a PDF report, an anomaly list with string, module and GPS position, and a thermal and RGB image pair for every anomaly. The delivery also includes an overview map and a thermal orthomosaic, within 5 working days of the flight for plants up to 20 MW. CSV or Excel export and the raw R-JPEG dataset are available on request.
How often should a PV plant be inspected?
Once a year as a baseline, plus after hail or storm events and before module warranties expire. Comparing yearly reports shows which faults are new and which are spreading. Each report also gives you dated, radiometric evidence for warranty and insurance claims, with the irradiance logged during the flight.
How is a drone inspection different from a manual check with a handheld thermal camera?
A drone records every module in one visit, while a handheld camera covers only the modules a technician reaches. Every finding gets GPS coordinates, a string and module index and an image pair, so results compare year on year. The plant keeps producing while we fly.
Can you deliver the data in our analytics platform's format?
Yes, we fly to your platform's spec, for example 6 cm thermal GSD with 85% front and 65% side overlap. Complete RGB/IR pairs, with EXIF and GPS intact, go into the folder structure you require or through your platform's uploader within 24–48 h of the flight. Files are not re-encoded, so the radiometric data reaches your analysis unchanged.
Get a quote for your PV plant
Send the location, the installed capacity and the mounting type. The written quote states the price, the flight window and the report date.
Reply within 24 h on working days
Written quote, no obligation
Your data stays confidential
We work across Romania, with mobilization in 24–72 h.