Skip to content
Drone Data

Thermal and visual

Drone inspection in Romania for buildings and industry

We inspect roofs, facades, industrial halls, power lines and wind turbines with thermal and high-resolution cameras. You receive an annotated report with a ranked defect list within 5 working days.

  • Thermal and RGB images from the same flight
  • Georeferenced image set with every report
  • No scaffolding, lifts or work at height
  • EASA A1/A3 and A2 certified pilots
  • Radiometric DJI Mavic 3T thermal drone
  • About half a day on site for a 10,000 m² roof
  • PDF report in 5 working days

What a drone inspection shows

A drone inspection records a building or structure from the air with thermal and RGB cameras. Facility managers, roofing contractors, industrial sites and energy companies receive an annotated PDF report and a georeferenced image set within 5 working days.

Thermal imaging shows temperature differences on a surface. On a flat roof, wet insulation holds heat longer than dry insulation. On a facade, a thermal bridge shows where heat leaves the building. On electrical equipment, a connector running hotter than its neighbours points to a fault.

Visual inspection uses the 56× zoom camera to read cracks, corrosion, loose fixings and blade erosion from a safe distance. Nobody climbs the structure, and the asset usually stays in service while we fly. Wind turbine blades are the exception: the operator stops the rotor for the duration of the flight.

We work in all of Romania and check the airspace for every site before the flight. You can attach the report to a repair tender, a maintenance plan or an insurance file.

Who orders a drone inspection

  • Facility managers

    Condition surveys of roofs and facades for maintenance plans and budgets.

  • Roofing contractors

    Leak and moisture mapping before a repair quote, and proof of work after it.

  • Industrial sites

    Halls, chimneys and tall structures inspected while production continues.

  • Energy companies

    Power lines and substations checked for hot connectors and damaged insulators.

  • Wind farm operators

    Visual records of blades and towers for maintenance planning.

  • Construction companies

    Progress documentation and as-built records of structures at each stage.

Why inspect from the air

  • No access equipment

    No scaffolding, lifts or rope access to see a roof, a chimney or a tower, and no one working at height.

  • Thermal and visual together

    One flight records heat patterns and visible damage, so each defect is documented both ways.

  • Defects you can find again

    Every image is georeferenced, so the repair team locates the defect on site from its position.

  • A ranked defect list

    The defect list ranks findings, so the repair budget goes to the urgent items first.

  • Comparable over time

    Repeating the same flight plan gives images you can compare year on year, or before and after a repair.

  • A 3D model from the same flight

    The same images can build a measurable 3D model of the structure through photogrammetry.

How a drone inspection runs

Five steps, each with a defined output, from your first message to the report.

  1. Brief

    You describe the asset, the problem you suspect and the access conditions. A written quote follows within 24 h on working days.

  2. Planning

    We choose thermal, visual or both, set the flight plan and check airspace and permissions for the site.

  3. Timing

    Thermal work on buildings needs a temperature difference between inside and outside, so we fly in the heating season, early in the morning.

  4. Flight

    We fly thermal and RGB, review the images on site and refly any gaps while the conditions still hold.

  5. Report

    Defects are annotated, ranked and delivered in a PDF report within 5 working days.

What you receive

The report and the image set come with every inspection. The 3D model and the video are options.

  • Annotated PDF report

    Thermal and visual images with every defect marked, described and ranked.

  • Defect list with priorities

    Location, type and priority of each finding, ready to hand to a contractor.

  • Georeferenced image set

    All original images with GPS position, for your records or a repair tender.

  • 3D model, optional

    A measurable model of the roof or structure, built by photogrammetry from the same flight.

  • Video walkthrough, optional

    A guided video of the asset for people who were not on site.

Inspection parameters

Inspection parameters
Thermal sensorRadiometric, 640×512
RGB sensor48 MP wide, 56× hybrid zoom
Building thermographyHeating season, early morningNeeds an inside to outside temperature difference
Visual inspectionAll year, in daylight
Time on siteAbout half a dayFor a 10,000 m² roof
Report5 working days after the flight

Sensor figures refer to the DJI Mavic 3T thermal drone.

Assets we inspect

  • Roofs and membranes

    Moisture under the membrane, insulation gaps, ponding, damaged flashing and drains.

  • Facades

    Thermal bridges, missing insulation, detached render and cladding.

  • Industrial halls and chimneys

    Roof sheets, gutters, skylights and stacks, usually inspected while production continues.

  • Power lines and substations

    Hot connectors and clamps, damaged insulators, vegetation near conductors.

  • Wind turbines

    Visual inspection of blades and towers for erosion, cracks and lightning damage.

  • Bridges and tall structures

    Close visual records of joints, concrete and steelwork.

  • Construction progress

    Regular flights that document each stage of a structure for the site file.

Radiometric thermal resolution
640×512
Hybrid zoom for close detail
56×
On site for a 10,000 m² roof
½ day
Report turnaround, working days
5 days

Questions about drone inspections

When is the best time for facade or roof thermography?

In the heating season, early in the morning, when the inside of the building is clearly warmer than the outside air and the sun has not yet warmed the surfaces. Without that temperature difference, defects do not show. Visual inspections have no such limit and can be flown all year in daylight.

What defects can a drone find on a roof?

Wet insulation under the membrane, insulation gaps, ponding water, blocked drains, damaged flashing, cracked or loose roof sheets and failed seams. Thermal imaging shows the moisture and heat loss; the RGB camera shows the visible damage. Each defect appears in the report with its position and priority.

Do you fly near power lines?

Yes, at a safe distance, using the 56× zoom and the thermal camera to spot hot connectors, clamps and damaged insulators. Each flight is planned with the network operator, and we check the airspace and any permission the route needs before the flight date is set.

Do you handle the flight permits for a drone inspection?

Yes: we check the airspace for every site and request any authorization a controlled or restricted zone needs before scheduling. Our pilots hold EASA open category A1/A3 and A2 certificates and fly under Romanian AACR rules. From you we need only the consent of the owner or building manager and access to the site.

What do I receive after a drone inspection?

An annotated PDF report with a ranked defect list and a georeferenced image set, within 5 working days of the flight. A 3D model of the structure and a video walkthrough are available as options, built from the same flight.

How long does a drone inspection take?

About half a day on site for a 10,000 m² roof, and the report follows within 5 working days. We fly anywhere in Romania, with mobilization in 24–72 h. Large industrial sites and long line sections are planned per site, and the written quote states the days on site and the delivery date.

What does a drone inspection cost?

The price depends on the roof area or line length, the inspection type (thermal, visual or both), any airspace authorization and the travel distance. A 3D model or a video walkthrough is priced as an option. Send the address and a few details, and you receive a written quote within 24 h on working days.

How is a drone inspection different from scaffolding or a ground check?

A drone covers a 10,000 m² roof in about half a day, with no scaffolding, lifts or people working at height. A check from the ground or from scaffolding sees only the areas within reach and cannot show moisture under the membrane. Repeating the same flight plan gives images you can compare year on year, or before and after a repair.

Get a quote for your inspection

Tell us the asset, its location and what you suspect. The written quote states the price, the days on site and the report date.

  • Reply within 24 h on working days
  • Written quote, no obligation
  • Your data stays confidential

We work across Romania, with mobilization in 24–72 h.

  • Reply within 24 h on working days
  • Written quote, no obligation
  • Your data stays confidential
CallWhatsAppQuote