Skip to content
Drone Data

Glossary

Drone inspection terms in plain words

Plain definitions of the terms in our quotes, reports and deliverables, from GSD and orthomosaics to IEC TS 62446-3. Each term links to the service where it matters.

Solar PV thermography

Thermography

Thermography measures the infrared radiation a surface emits and turns it into an image of temperatures. Temperature differences show where a PV module, a roof or an electrical connection is not working as it should.

Related service: Thermal and visual drone inspections

Radiometric thermal camera

A radiometric thermal camera records the temperature of every pixel, so temperatures can be measured on the saved image after the flight. Our main drone, the DJI Mavic 3T, carries a 640×512 radiometric thermal sensor.

Related service: Solar farm thermal inspection

R-JPEG

R-JPEG is the format in which DJI thermal cameras store a standard image together with the radiometric data of every pixel. Analytics platforms read temperatures straight from these files, which is why we deliver them unconverted.

Related service: Data acquisition

Irradiance

Irradiance is the power of solar radiation reaching a surface, measured in W/m². PV modules are inspected at 600 W/m² or more, following IEC TS 62446-3 recommendations, because defects only show while the modules produce power.

Related service: Solar farm thermal inspection

IEC TS 62446-3

IEC TS 62446-3 is the international technical specification for outdoor infrared thermography of photovoltaic systems in operation. It sets the measurement conditions, the camera requirements and the content of the report. Our flights follow its recommendations: irradiance of at least 600 W/m², a clear sky and wind within the drone's limits.

Related service: Solar farm thermal inspection

Hotspot

A hotspot is an area of a PV module that runs warmer than the cells around it, a sign that a cell produces less and releases energy as heat. Common causes are cracked cells, shading, soiling and soldering defects.

Related service: Solar farm thermal inspection

Bypass diode

A bypass diode routes current around a group of cells in a module when that group stops producing, so the rest of the module keeps working. An active diode takes about one third of the module out of production and shows as a warm band in the thermal image.

Related service: Solar farm thermal inspection

PID (potential-induced degradation)

PID is the degradation of PV modules caused by the voltage difference between the cells and the frame, which reduces power output. In the thermal image it usually shows as a pattern of warmer modules towards one end of the string.

Related service: Solar farm thermal inspection

String

A string is a chain of PV modules wired in series. A string that is offline shows in the thermal image as a whole row of modules warmer than its neighbours.

Related service: Solar farm thermal inspection

Thermal orthomosaic

A thermal orthomosaic is a georeferenced map of the whole site, stitched from the thermal images of the flight. It shows at a glance where anomalies cluster.

Related service: Solar farm thermal inspection

Photogrammetry and mapping

Photogrammetry

Photogrammetry derives measurements, maps and 3D models from overlapping photos of the same ground taken from different positions. Drone imagery yields orthomosaics, elevation models, point clouds and volume calculations.

Related service: Drone photogrammetry and mapping

Orthomosaic

An orthomosaic is a geometrically corrected aerial image in which every pixel sits at its true map position, so distances and areas can be measured on it. We deliver GeoTIFF orthomosaics, typically at 2–3 cm/pixel.

Related service: Drone photogrammetry and mapping

GSD (ground sample distance)

GSD is the ground size of one image pixel: at a GSD of 3 cm, one pixel covers a 3 × 3 cm square. A smaller GSD means a lower and longer flight. For solar farm thermal inspections we fly to a thermal GSD of 3–6 cm.

Related service: Solar farm thermal inspection

Front and side overlap

Overlap is the share of an image that also appears in the next image (front overlap) and on the neighbouring flight line (side overlap). For data delivered to analytics platforms we usually fly 85% front and 65% side overlap.

Related service: Data acquisition

DSM and DTM

A digital surface model (DSM) gives the elevation of everything visible, buildings and vegetation included, while a digital terrain model (DTM) keeps only the bare ground. Contours, profiles and volume calculations are derived from them.

Related service: Drone photogrammetry and mapping

Point cloud

A point cloud is a set of millions of points with X, Y and Z coordinates that describes the shape of terrain or a structure. It comes from photogrammetry or LiDAR and is usually delivered as LAS or LAZ.

Related service: Drone photogrammetry and mapping

Ground control points (GCPs)

Ground control points are targets marked on site and surveyed with GNSS, tying the photogrammetric model to real-world coordinates. With GCPs or PPK, horizontal accuracy reaches 2–5 cm.

Related service: Drone photogrammetry and mapping

PPK and ROMPOS

PPK (post-processed kinematic positioning) corrects the GNSS positions of the photos after the flight, using data from a reference station. In Romania the corrections come from ROMPOS, the national positioning service.

Related service: Drone photogrammetry and mapping

LiDAR

LiDAR is a laser sensor that measures the distance to the ground with very frequent pulses and outputs a point cloud directly. Unlike photogrammetry, it can measure the ground under vegetation. LiDAR missions are available on request.

Related service: Drone photogrammetry and mapping

Volume calculation

A volume calculation measures the amount of material in a stockpile, an aggregate store or an excavation from the 3D surface model. The result is delivered as a PDF or XLSX report.

Related service: Drone photogrammetry and mapping

Data, delivery and regulation

EXIF

EXIF is the metadata the camera writes into every photo: date, time, GPS position, altitude and camera settings. Analytics platforms need intact EXIF to place each image, which is why we deliver files without re-encoding.

Related service: Data acquisition

360° virtual tour

A 360° virtual tour is a set of linked panoramic photos through which a visitor moves around a space in the browser, with no app to install. It can include drone panoramas, information points and a floor plan.

Related service: 360° virtual tours

Open category A1/A3 and A2

The open category covers low-risk drone operations under EU Regulation 2019/947. For subcategories A1/A3 the pilot completes online training and a test; the A2 certificate requires an additional exam and allows flying closer to people.

Related service: About

AACR

The Romanian Civil Aeronautical Authority (AACR) applies the European drone rules in Romania. Operators register with it, and it issues the pilot certificates.

Related service: About

O&M (operation and maintenance)

O&M refers to the companies that run and maintain a solar plant after commissioning. They usually order the yearly thermal inspection.

Related service: Solar farm thermal inspection

EPC

EPC (engineering, procurement and construction) is the contractor that designs, procures and builds a solar plant up to handover. A thermal inspection at handover shows defects before the plant passes to the owner.

Related service: Solar farm thermal inspection

Discuss the spec with a pilot

Tell us what needs to be inspected or mapped, and where. You receive a written quote with the flight parameters explained.

  • Reply within 24 h on working days
  • Written quote, no obligation
  • Your data stays confidential

We work across Romania, with mobilization in 24–72 h.

  • Reply within 24 h on working days
  • Written quote, no obligation
  • Your data stays confidential
CallWhatsAppQuote