Skip to content
Drone Data

360° virtual tours

360° virtual tours portfolio

360° virtual tours for a resort, an event venue, a hotel, a ski resort, villas, a residential building and a construction site, with 8 tours online.

Sector
Hospitality and real estate
Region
Romania
Year
Ongoing

We have produced 360° virtual tours for a resort, an event venue, a hotel reception, a ski resort, two villas, a residential building and a construction site. All eight are public and open in any browser, with no app to install.

Tours combine ground panoramas with aerial scenes where the site benefits from them, so a visitor sees the property and its surroundings. Tours are hosted on our viewer, carry the client’s logo and colours, and can include interactive hotspots and floor plans.

A tour embeds on any website, and Google Street View publishing for the business profile is available on request. Capture takes about half a day on site for a villa and one day for a resort, and delivery follows in 5–7 working days.

Deliverables

  • Hosted 360° tour with client branding
  • Embed code for the client website
  • Interactive hotspots and floor plan
  • Google Street View publishing on request

Related projects

    • Solar energy
    • Solar farm inspection

    60 MWp solar park thermal survey, Alba County

    Thermal and RGB acquisition to the specification of an analytics platform on a solar park of about 60 MWp and 70 ha in Alba County, 2026.

    Installed capacity
    ~60 MWp
    Site area
    ~70 ha
    Thermal GSD
    6 cm
    • Solar energy
    • Solar farm inspection

    About 56 MW PV park data acquisition, Satu Mare

    Thermal and RGB data acquisition for an international pilot network on a solar park of about 56 MW in Satu Mare County, 2026.

    Installed capacity
    ~56 MW
    Data format
    RGB/IR folder pairs
    Delivery
    Through the network's uploader
    • Solar energy
    • Solar farm inspection

    9.5 MW solar park thermal acquisition, Prahova

    Data acquisition for the thermal inspection of a 9.5 MW solar park in Prahova County, flown in about 2 h 15 min on site in 2026.

    Installed capacity
    9.5 MW
    Time on site
    2 h 15 min
    Drone
    DJI Mavic 3T

Plan a mission like these

Send the site, the size and the specification you work to. You receive a written quote with the flight window and the delivery date.

  • Reply within 24 h on working days
  • Written quote, no obligation
  • Your data stays confidential

We work across Romania, with mobilization in 24–72 h.

  • Reply within 24 h on working days
  • Written quote, no obligation
  • Your data stays confidential
CallWhatsAppQuote