Solar farm inspection
60 MWp solar park thermal survey, Alba County
Thermal and RGB acquisition to the specification of an analytics platform on a solar park of about 60 MWp and 70 ha in Alba County, 2026.
- Sector
- Solar energy
- Region
- Alba County
- Year
- 2026
A PV analytics platform needed a local acquisition partner for a solar park of about 60 MWp and 70 ha in Alba County. The platform supplied a fixed specification: 6 cm thermal GSD, 85% front and 65% side overlap, and a radiometric DJI Mavic 3T.
GSD, the ground size of one image pixel, sets the flight altitude, so we built the flight plan around it. We scheduled the flights near solar noon, at irradiance of at least 600 W/m². The site was covered in one to two flight days, with coverage checked on site before leaving.
The client received the complete RGB/IR dataset with EXIF and GPS data intact, in the folder structure the platform requested and ready for its own anomaly analysis.
Deliverables
- Complete RGB/IR image set, one RGB frame for every thermal frame
- EXIF, GPS and radiometric data preserved
- Folder structure as required by the platform
- Mission log with flight and irradiance conditions
Related projects
- Solar energy
- Solar farm inspection
About 56 MW PV park data acquisition, Satu Mare
Thermal and RGB data acquisition for an international pilot network on a solar park of about 56 MW in Satu Mare County, 2026.
- Installed capacity
- ~56 MW
- Data format
- RGB/IR folder pairs
- Delivery
- Through the network's uploader
- Solar energy
- Solar farm inspection
9.5 MW solar park thermal acquisition, Prahova
Data acquisition for the thermal inspection of a 9.5 MW solar park in Prahova County, flown in about 2 h 15 min on site in 2026.
- Installed capacity
- 9.5 MW
- Time on site
- 2 h 15 min
- Drone
- DJI Mavic 3T
- Commercial rooftop PV
- Solar farm inspection
Rooftop PV inspection, Iași shopping centre
Full thermal inspection of the rooftop PV system of a shopping centre in Iași, 2026, carried out as a subcontractor to an O&M contractor.
- Asset
- Rooftop PV, shopping centre
- Role
- Subcontractor to an O&M contractor
- Scope
- Acquisition, analysis, classification
Plan a mission like these
Send the site, the size and the specification you work to. You receive a written quote with the flight window and the delivery date.
- Reply within 24 h on working days
- Written quote, no obligation
- Your data stays confidential
We work across Romania, with mobilization in 24–72 h.