Solar farm inspection
About 56 MW PV park data acquisition, Satu Mare
Thermal and RGB data acquisition for an international pilot network on a solar park of about 56 MW in Satu Mare County, 2026.
- Sector
- Solar energy
- Region
- Satu Mare County
- Year
- 2026
An international pilot network assigned us the acquisition of a solar park of about 56 MW in Satu Mare County in 2026. The network’s analysis team needed thermal and RGB imagery its pipeline could process without manual sorting.
We flew the site within the irradiance window set by the network’s specification and paired every thermal frame with its RGB frame. Before upload, we checked coverage, image sharpness and the file count against the flight log.
The data went to the network through its own uploader as RGB/IR folder pairs, with the original files unchanged. No conversion or re-encoding was applied, so the radiometric data reached the analysis exactly as the drone recorded it.
Deliverables
- Paired RGB and IR folders for the full site
- Original files with EXIF, GPS and thermal data intact
- Upload through the platform uploader
Related projects
- Solar energy
- Solar farm inspection
60 MWp solar park thermal survey, Alba County
Thermal and RGB acquisition to the specification of an analytics platform on a solar park of about 60 MWp and 70 ha in Alba County, 2026.
- Installed capacity
- ~60 MWp
- Site area
- ~70 ha
- Thermal GSD
- 6 cm
- Solar energy
- Solar farm inspection
9.5 MW solar park thermal acquisition, Prahova
Data acquisition for the thermal inspection of a 9.5 MW solar park in Prahova County, flown in about 2 h 15 min on site in 2026.
- Installed capacity
- 9.5 MW
- Time on site
- 2 h 15 min
- Drone
- DJI Mavic 3T
- Commercial rooftop PV
- Solar farm inspection
Rooftop PV inspection, Iași shopping centre
Full thermal inspection of the rooftop PV system of a shopping centre in Iași, 2026, carried out as a subcontractor to an O&M contractor.
- Asset
- Rooftop PV, shopping centre
- Role
- Subcontractor to an O&M contractor
- Scope
- Acquisition, analysis, classification
Plan a mission like these
Send the site, the size and the specification you work to. You receive a written quote with the flight window and the delivery date.
- Reply within 24 h on working days
- Written quote, no obligation
- Your data stays confidential
We work across Romania, with mobilization in 24–72 h.