Solar farm inspection
Rooftop PV inspection, Iași shopping centre
Full thermal inspection of the rooftop PV system of a shopping centre in Iași, 2026, carried out as a subcontractor to an O&M contractor.
- Sector
- Commercial rooftop PV
- Region
- Iași
- Year
- 2026
An O&M contractor needed a thermal inspection of the PV system on the roof of a shopping centre in Iași. We worked as its subcontractor and covered the full chain: acquisition, analysis, anomaly classification and reporting.
On a rooftop, the inspection has to separate real defects from shading and soiling. Each anomaly was checked against its RGB pair before it was classified by type and severity in Scopito and located by module position.
The contractor received the Scopito report and a final PDF report with the anomaly summary, the methodology and the recommendation for the next inspection, ready to plan repairs on the roof.
Deliverables
- Thermal and RGB acquisition of the rooftop array
- Anomaly classification by type and severity
- Scopito report
- Final PDF report with conclusions and recommendations
Related projects
- Solar energy
- Solar farm inspection
60 MWp solar park thermal survey, Alba County
Thermal and RGB acquisition to the specification of an analytics platform on a solar park of about 60 MWp and 70 ha in Alba County, 2026.
- Installed capacity
- ~60 MWp
- Site area
- ~70 ha
- Thermal GSD
- 6 cm
- Solar energy
- Solar farm inspection
About 56 MW PV park data acquisition, Satu Mare
Thermal and RGB data acquisition for an international pilot network on a solar park of about 56 MW in Satu Mare County, 2026.
- Installed capacity
- ~56 MW
- Data format
- RGB/IR folder pairs
- Delivery
- Through the network's uploader
- Solar energy
- Solar farm inspection
9.5 MW solar park thermal acquisition, Prahova
Data acquisition for the thermal inspection of a 9.5 MW solar park in Prahova County, flown in about 2 h 15 min on site in 2026.
- Installed capacity
- 9.5 MW
- Time on site
- 2 h 15 min
- Drone
- DJI Mavic 3T
Plan a mission like these
Send the site, the size and the specification you work to. You receive a written quote with the flight window and the delivery date.
- Reply within 24 h on working days
- Written quote, no obligation
- Your data stays confidential
We work across Romania, with mobilization in 24–72 h.