Aerial photo and video
Aerial video of 20+ solar parks
More than 20 solar parks across Romania filmed and photographed from the air for marketing and investor reports, 2023 to 2026.
- Sector
- Solar energy
- Region
- Romania
- Year
- 2023–2026
Since 2023 we have filmed and photographed more than 20 solar parks in Romania for developers, owners and EPC marketing teams. The footage serves two uses: marketing, and investor updates that show the state of a site.
A solar park reads best from the air, because the layout, the scale and the progress of construction fit in one frame. We plan each flight around the light and the orientation of the rows, then edit, colour grade and deliver in web and social formats.
Because we also inspect solar farms, one visit can combine a thermal inspection with a marketing shoot, which saves the client a second mobilization.
Deliverables
- Edited video in 16:9 and 9:16
- 4K master file
- Photo set for web and print
- Usage rights included
Related projects
- Solar energy
- Solar farm inspection
60 MWp solar park thermal survey, Alba County
Thermal and RGB acquisition to the specification of an analytics platform on a solar park of about 60 MWp and 70 ha in Alba County, 2026.
- Installed capacity
- ~60 MWp
- Site area
- ~70 ha
- Thermal GSD
- 6 cm
- Solar energy
- Solar farm inspection
About 56 MW PV park data acquisition, Satu Mare
Thermal and RGB data acquisition for an international pilot network on a solar park of about 56 MW in Satu Mare County, 2026.
- Installed capacity
- ~56 MW
- Data format
- RGB/IR folder pairs
- Delivery
- Through the network's uploader
- Solar energy
- Solar farm inspection
9.5 MW solar park thermal acquisition, Prahova
Data acquisition for the thermal inspection of a 9.5 MW solar park in Prahova County, flown in about 2 h 15 min on site in 2026.
- Installed capacity
- 9.5 MW
- Time on site
- 2 h 15 min
- Drone
- DJI Mavic 3T
Plan a mission like these
Send the site, the size and the specification you work to. You receive a written quote with the flight window and the delivery date.
- Reply within 24 h on working days
- Written quote, no obligation
- Your data stays confidential
We work across Romania, with mobilization in 24–72 h.