Skip to content
Drone Data

Solar farm inspection

About 10 MW solar park thermal acquisition, Prahova

Data acquisition for the thermal inspection of a roughly 10 MW solar park in Prahova County, flown in about 2 h 15 min on site in 2026.

Sector
Solar energy
Region
Prahova County
Year
2026

We flew this solar park of about 10 MW in Prahova County in 2026 for an international pilot network, as the data acquisition for a thermal inspection.

The whole acquisition took about 2 h 15 min on site, with a DJI Mavic 3T capturing paired thermal and RGB frames. That pace comes from preparing the mission before arrival: flight lines, altitude and overlap were fixed in advance, so the time on site went into flying and checking coverage.

A park of this size fits in one visit and one irradiance window.

Deliverables

  • Complete thermal and RGB dataset for the park
  • Coverage and file count check before delivery
  • Mission log with irradiance during the flight

Related projects

    • Solar energy
    • Solar farm inspection

    60 MWp solar park thermal survey, Alba County

    Thermal and RGB acquisition to the specification of an analytics platform on a solar park of about 60 MWp and 70 ha in Alba County, 2026.

    Installed capacity
    ~60 MWp
    Site area
    ~70 ha
    Thermal GSD
    6 cm
    • Solar energy
    • Solar farm inspection

    About 56 MW PV park data acquisition, Satu Mare

    Thermal and RGB data acquisition for an international pilot network on a solar park of about 56 MW in Satu Mare County, 2026.

    Installed capacity
    ~56 MW
    Data format
    RGB/IR folder pairs
    Delivery
    Through the network's uploader
    • Commercial rooftop PV
    • Solar farm inspection

    Rooftop PV inspection, Iași shopping centre

    Full thermal inspection of the rooftop PV system of a shopping centre in Iași, 2026, carried out for an O&M contractor.

    Asset
    Rooftop PV, shopping centre
    Client
    O&M contractor
    Scope
    Acquisition, analysis, classification

Plan a mission like these

Send the site, the size and the specification you work to. You receive a written quote with the flight window and the delivery date.

  • Reply within 24 h on working days
  • Written quote, no obligation
  • Your data stays confidential

We work across Romania, with mobilization in 24–72 h.

  • Reply within 24 h on working days
  • Written quote, no obligation
  • Your data stays confidential
CallWhatsAppQuote